Table of Contents
Developer's Resubmission, April 2006

Note:  These plans are NOT approved.   Some of the issues  (for example, the omission of the building lines) have already been identified by Village staff.   Village staff is still reviewing and making appropriate comments per the Village Council's conditional approval on February 20, 2006.
Item
Number
No. of
Pages

Subject

1 4 Letter from Brad Hartjes to Jeff O'Brien, April 5, 2006
2 1 Stormwater Facilities Engineer's Opinion of Probable Cost, March 21, 2006
Note: Total is $168,099.75
3 1 Stormwater Sewer Computation Sheet, March 16, 2006
4 2 Retaining Wall Exhibit B, north-south cross-section at west end of detention pond
Note: Shows retaining wall 10.5' from property line
5 2 Retaining Wall Exhibit D, north-south cross-section at east end of detention pond
Note:  Shows retaining wall 24.5' from property line
6 2 Retaining Wall Exhibit G, east end of lots #9 and #10
Note:  Sidewalk re-routed partially onto properties with retaining wall to protect two parkway trees
7 1 Color illustration of plantings along retaining wall, no title or date
8 1 Green Grass, Inc., list of planting materials, no title or date
    Revised Plans
9 1 Final Plat of Subdivision -- drawing, March 21, 2006
Note: Nelson Court "stem" is 70'; new 3.5' sidewalk easement across the east ends of Lots #9 and #10, lot dimensions adjusted; NO building lines along Brookbank and Carpenter
1 Final Plat of Subdivision -- text, March 21, 2006
Note: NO covenant concerning building lines along Brookbank and Carpenter
10 1 Tree Preservation Exhibit for Area South of Retention Pond and Along Carpenter Street, March 21, 2006
Note: "Proposed silt fence to be located on property line along the south side of pond.  Also provide semi-permanent chain link fence on south property line to protect trees south of property.  Fence to be installed prior to any sitework beginning.  Tree root pruning to be conducted at the direction of Village arborist and developer's consultant, in coordination."
11 1 Photometricsm April 5, 2006
Note:  Three street lights on east side of Brookbank, three street lights on west side of Carpenter, four street lights on north side of Jefferson, and two street lights on the Nelson Court cul-de-sac.
12 1 Proposed Site Improvements -- cover page for engineering drawings, April 5, 2006
1 General Notes, April 11, 2006
1 General Notes and Details, April 11, 2006
1 Details, April 11, 2005
Note:  Contains Carpenter block wall detail
1 Details, April 11, 2005
Note: Shows "Attractive Acorn Post-Top Fixtures" for street lights
1 Existing Conditions, April 11, 2006
1 Geometric Plan, April 11, 2006
Note:  Shows Nelson Court "stem" sidewalks pushed back to new property lines, and shows five marked areas for excavation across existing Jefferson Avenue (for water service replacement)
1 Grading Plan, April 11, 2006
1 Utility Plan, April 11, 2006
Note:  New north-south Brookbank water main relocated under street; new east-west water main relocated under detention pond; and five existing Jefferson b-boxes relocated south of sidewalk (where is Cronin's water service and b-box?)
1 Jefferson Avenue Profile, April 11, 2006
1 Brookbank Road Profile, April 11, 2006
1 Erosion Control Plan, April 11, 2006
Note: "Proposed silt-fence located one foot inside property line (typ), provide semi-permanent chain link fence along south side of detention pond to protect trees south of property"
1 Retaining Wall Notes & Detail, June 1, 2005
1 Retaining Wall Details, June 1, 2005
1 Retaining Wall Panel Elevation, June 1, 2005

Index and comments by John Schofield, April 26, 2006